| While it is desirable to have the test
environment exactly match the production environment configuration,
this is seldom practical or possible. In most cases, the test environment
is a scaled-down version and the workload targets have to be adjusted
accordingly. This tool helps you determine the test environment
target workload. The exact methodology and the steps are available
in Methodology Pack WPT041.
Designed, Developed and Copyright © 2006-2007
by PEA.
Disclaimer
*Practical ranges and limits of Capacity Factor needs
to be understood for using this tool effectively.
|